NEW-BUILD FINISHING

Having your new-build home finished

Many new-build homes are handed over without a floor and with bare walls. Noordvaro takes on the finishing afterwards in one job: painting walls and ceilings, laying laminate or click PVC, fitting skirting and, where needed, adjusting doors or building an extra wall.

Laminate being laid from the wall, on an underlay

Complete package

From key handover to a home you can live in

After handover you want to move in soon, but the order of the work matters. First the walls and ceilings, then the floor, then skirting and the last connections. When one crew does this in sequence, you do not have to coordinate separate parties.

Check the technical specification of your home to see how the walls are handed over. Walls prepared for wallpaper are usually not smooth enough to paint directly; they first need to be made paint-ready. Send us the specification or photos and we will tell you what we can do and where a plasterer is needed.

One crew and one schedule

When this fits

For buyers and landlords of a new-build home.

  • A home handed over without a floor finish
  • Walls and ceilings that still need painting
  • An attic or open floor you want to divide into rooms
  • You want one point of contact for the finishing after handover

SCOPE

What the package can include

You choose the parts; we record them in one agreement.

  • Painting walls and ceilings
  • Laying laminate or click PVC, with underlay
  • Fitting skirting and trims, sealing joints
  • Adjusting or trimming doors after the floor is laid
  • A partition wall or a finished attic, by agreement

Kitchens, bathrooms, tiling, electrics, smooth plastering and garden work are not part of this package. Fixing handover defects is work for your builder.

METHOD

How we handle the finishing

A fixed order, matched to your handover date.

  1. Home and wishes

    You send the floor plan or technical specification and tell us what you want done.

  2. Assessing

    We look at the walls, the screed, the underfloor heating and the heights at doors.

  3. Agreements

    We record the parts, materials and order in one job.

  4. Carrying out

    First walls and ceilings, then the floor, then skirting and connections.

  5. Handover

    We check the home together and tidy up.

PRICE

What determines the price of a package?

A package is the sum of the parts you choose, planned as one job.

  • Chosen parts

    Which work you want in the package, and which you do yourself or leave to others.

  • Size of the home

    The number of rooms, square metres and floors.

  • Condition of the home

    A new-build home needs different preparation than a home refreshed between two occupants.

  • Schedule

    Whether the home is empty and how the work fits around other trades, such as a kitchen or bathroom.

How to get a matching price sooner

  • A floor plan or technical specification
  • Photos per room
  • A list of what you want done

Our website shows no fixed prices, because every home is different. You receive a quotation for your situation, and we only start once you agree with the work and the price.

BUILD-UP AND MATERIALS

Materials that suit new-build

New walls are very absorbent, so we apply a primer first and then the finishing coats of emulsion paint. We agree the colour and paint type with you beforehand.

Most new-build homes have underfloor heating. We choose a floor and underlay suited to it and follow the floor manufacturer’s instructions for warming up and laying.

WORKING AREA

New-build finishing in Drenthe and Groningen

From Assen we finish new-build homes across Drenthe, in Groningen and the surrounding northern Netherlands.

Explore the full service area

FREQUENTLY ASKED QUESTIONS

New-build finishing questions

About walls, floors and planning around the handover.

When should I arrange the finishing?

Preferably well before handover, as soon as you have the handover date and the technical specification. Then we can agree the order in time.

My walls are only ready for wallpaper. Can you paint them?

Usually not directly. Walls prepared for wallpaper first need to be made paint-ready. We will tell you what we can do and where a plasterer is needed.

Can the floor go on underfloor heating?

Yes, provided the floor and underlay are suitable according to the manufacturer. We check that beforehand.

Do I have to take every part?

No. You choose which parts you have done. Only the floor or only the painting is also possible.

Do you also fix handover defects?

No. Defects noted at handover are repaired by your builder. We do the finishing afterwards.

Can I buy the floor or paint myself?

Yes. Do agree the choice with us beforehand, so the underlay, skirting and primer match.

NEW-BUILD FINISHING

Tell us when your home is handed over

Send the floor plan or technical specification and tell us which parts you want done. We will tell you what we can carry out.

WhatsApp