EXTRA ROOM

Having an extra room created

An extra bedroom, a workspace or a room of their own for a child: often the space is already there, but the layout is missing. Noordvaro turns part of a large room or attic into a finished space, with wall, door, ceiling, floor and painting in one job.

Metal stud framing for two new walls in a living room

Complete package

A room is more than a wall

A new room needs a wall with a door, but also a finished ceiling, a floor that continues or ends neatly, skirting and painting. Planning that as one whole makes the parts fit together.

In an attic this often comes with insulation, a roof window or a knee wall. Then we look at the roof and insulation first and only then at the layout. Requirements for daylight and ventilation apply when a space is used as a bedroom; we discuss those with you beforehand.

From empty space to a room

When this fits

For homes where the space is there but the layout is missing.

  • Splitting a large bedroom or living room
  • Dividing an attic into one or two rooms
  • Separating a workspace or study
  • Creating a storage room or walk-in wardrobe

SCOPE

What the package can include

You choose the parts; we record them in one agreement.

  • Partition wall of stud frame and gypsum boards, with insulation
  • Setting a door frame and hanging the door
  • Finishing or renewing the ceiling
  • Laying or extending the floor, fitting skirting
  • Painting walls and ceiling

Connecting electrics and heating, changing load-bearing walls, dormers and permit applications are not part of this package. Those need an electrician, a structural engineer or your municipality.

METHOD

How we create an extra room

First the layout, then the build-up.

  1. Wish and space

    You tell us what the room is for and send photos or a sketch.

  2. Assessing

    We look at daylight, ventilation, pipes and the connection to floor and ceiling.

  3. Agreements

    We record the layout, build-up and finish level in one job.

  4. Building

    Wall, door frame and ceiling; then floor and skirting.

  5. Finishing

    Finishing joints, painting, sealing and tidying up.

PRICE

What determines the price of a package?

A package is the sum of the parts you choose, planned as one job.

  • Chosen parts

    Which work you want in the package, and which you do yourself or leave to others.

  • Size of the home

    The number of rooms, square metres and floors.

  • Condition of the home

    A new-build home needs different preparation than a home refreshed between two occupants.

  • Schedule

    Whether the home is empty and how the work fits around other trades, such as a kitchen or bathroom.

How to get a matching price sooner

  • A floor plan or technical specification
  • Photos per room
  • A list of what you want done

Our website shows no fixed prices, because every home is different. You receive a quotation for your situation, and we only start once you agree with the work and the price.

BUILD-UP AND MATERIALS

Lightweight build-up, good sound dampening

We build the walls from a metal or timber stud frame with gypsum boards and mineral wool in between. A double board layer dampens sound better, which is pleasant for a bedroom or workspace.

For the floor and painting we match what is in the rest of the home, or you choose something new. We discuss beforehand which materials fit.

WORKING AREA

Extra rooms in Drenthe and Groningen

From Assen we create extra rooms across Drenthe, in Groningen and the surrounding northern Netherlands.

Explore the full service area

FREQUENTLY ASKED QUESTIONS

Extra room questions

About permits, sound and what is involved.

Is a permit needed?

For a light interior wall usually not. If the structure, the facade or the use of the home changes, that can be different. When in doubt, check with your municipality; in an apartment also ask the owners’ association.

May the space be used as a bedroom?

A habitable room has requirements for daylight, ventilation and height, among other things. We discuss beforehand what is feasible in your situation; when in doubt we advise checking with the municipality.

Do you also arrange sockets and heating?

We make room in the wall and agree the order of work. The connection is done by an electrician or heating engineer.

How soundproof is the wall?

That depends on the build-up. Insulation between the studs and a double board layer dampen noticeably better than a single board.

Is it possible in an attic without insulation?

Then we deal with the roof first. A room below an uninsulated roof is cold in winter and warm in summer; see our complete attic renovation for that.

EXTRA ROOM

Tell us which space you want to divide

Send photos of the space and a sketch or description of the layout you want. We will tell you what we can carry out.

WhatsApp